Update to FW Outing: Sabine River, Generation Canal, 13-16th June 2024 (Thursday -Sunday)
We may be fishing the lake the entire time: Sabine River Authority, Engineering
| June | Any stage Above 168 ** Above 172 | Use Volume necessary to meet Prime Power Schedule (see Note 2.)Operate plant up to full capacity. * |
IF the spillway gates are open, the road and recreation area below the spill way, will be closed.
Water flow below the dam is so high that they have closed the roads downstream. I will keep an eye out for the river access. I hope we are able to fish the river. The lake fishing is good, but the river can be great!
“Puck”